The construction work will be carried out in two construction phases with full road closures of the respective road sections.
The first construction phase from 10.08.2020 to 17.08.2020 covers Üfinger Straße from the southern entrance to the village to the junction with Zum Dorfplatz. The second construction phase from 18.08.2020 to 28.08.2020 begins before the Zum Dorfplatz junction and ends at the entrance to Salzgitter-Üfingen after the Südstraße junction. A corresponding detour will be signposted.
The bus stop in Üfinger Straße will be relocated to the village square near the fire station during the construction work. Traffic obstructions are to be expected.