Specifically, the construction of a new substation near the load centers of the aforementioned companies is planned.
In addition, TenneT is planning the construction of a 380 kV overhead line to connect with the Wahle-Mecklar line (specifically: Wahle-Lamspringe). This will require the construction of a switchgear to connect the two lines at the crossing point with the 380 kV Wahle-Lamspringe line.
The Salzgitter industrial line supplies electricity from renewable energies for the green industry of tomorrow. This also makes it an essential element of the grid expansion in the Hanover-Braunschweig-Göttingen-Wolfsburg Metropolregion.